212-737-5720 info@igpny.com
  • Facebook
  • LinkedIn
  • Print
  • Facebook
  • LinkedIn
  • Print
Intelligreen Partners
energy efficiency retrofit
consulting for multifamily and
commercial buildings
  • Home
  • About
    • About Us
    • Services
    • Mission
    • Testimonials
  • Services
    • Our Services
    • IGP’s Energy Efficiency Action Plan
    • Project Management
    • Accessing Financing Options
    • Energy Audits & Benchmarking
    • Lighting Retrofits and Electric Sub-metering
    • LL43/10 Phases Out No. 4 Oil by 2030
  • Climate Mobilization Act
    • Climate Mobilization Act
    • NYC Energy Conservation Laws
    • Local Law 97/19 F.A.Q.
    • LL97 Penalty Calculator
    • Local Law 96/19 PACE Loans
    • NYC Green Building Programs
  • Projects
    • Projects by Category
      • Case Studies: Commercial
      • Case Studies: Co-ops & Condos
      • Case Studies: Affordable Housing
    • Energy Efficiency Action Plan
    • Electrification Projects (ASHP)
    • Lighting Retrofits Save Money
    • NYC Retrofit Accelerator Projects
    • LL87 Energy Audit & LL84 Benchmarking Projects
    • Fuel Conversion Projects
  • Resources
    • Galleries
  • Contact
Select Page

Images tagged "liner"

Apartment windows were replaced with aluminum double-paned windows in the late 1980s
Chimney for No. 6 oil fired boiler
Delivery of stainless steel chimney liner sections on the roof.
Delivery of stainless steel chimney liner sections on the roof.
The stainless steel sleeve
medical office retro fit
The chimney is accessible by stairs and ladder through a hatch to an area where scaffolding may be installed.
The chimney is accessible by stairs and ladder through a hatch to an area where scaffolding may be installed.
This building converted from using No. 4 oil to natural gas. The owner installed a dual fuel burner for added fuel flexibility in future years.
Installing new chimney liner
Installing new chimney liner
Installing the chimney liner
London Terrace buckets of thermocrete
Thermocrete Chimney Liner Installation
Thermocrete Chimney Liner Installation
London Terrace inside chimney with thermocrete liner
Mobile Boiler Unit
The two circles are either end of the new 1,500 gallon back-up oil tank. The pieces on the side will be welded at the site to the bottom pieces and places on the concrete slab on the left side of the refurbished tank room.
The new oil tank is lowered into the building's basement in at least 10 pieces (8 side sections and 2 end sections) which are welded together on site.
Chimney liner resting on footing at the bottom of the chimney stack, which went below grade originally to meet the stack used when the boiler used only oil.  A "clean out door" at the bottom of the stack. A bracket is installed at the top and bottom of the new chimney liner inside the stack. The liner rests at the bottom of the stack on a footing. On average the contractor can weld and install 20' of liner per day.

1 2 ►

INTELLIGREEN PARTNERS

WBE Certified by New York City & New York State

t: 212-737-5720
f: 800-475-2108
e: info@igpny.com

seal

 

REQUEST IGP TO SPEAK

We can educate your organization’s members and employees on how compliance with NYC’s Green Building Laws will improve the energy and water efficiency of NYC’s largest buildings.

Contact IntelliGreen to be an integral part of your next event or monthly meeting.

PROJECTS

carbon emission reduction. fuel conversion.
We assist commercial and multi-family buildings to comply with NYC’s Green Building & Climate Mobilization Act Laws so you meet important deadlines. LEARN MORE

WBE CERTIFICATIONS

  • Home
  • About Us
  • our services
  • NYC Energy Conservation Laws
  • projects
  • galleries
  • resources
  • contact us
  • Privacy Policy
  • Facebook
  • LinkedIn
  • Print

Intelligreen Partners, LLC (WBE Certified by NYC & NYS) New York, New York | t 212-737-5720 m 917-439-9731 f 800-475-2108
© COPYRIGHT 2025 | Optimized Web Design by SEO Web Mechanics